日日久久大香线蕉综合

  1. <button id="si2xm"></button>

    <progress id="si2xm"></progress>

    <progress id="si2xm"></progress>
    <progress id="si2xm"><big id="si2xm"><video id="si2xm"></video></big></progress>
  2. <nav id="si2xm"><center id="si2xm"></center></nav>
  3. <rp id="si2xm"></rp>
    Home BBNEP Laboratory Material Treatment Scheme

    Solution for mining treatment

    Solution for mining treatment
    Solution for mining treatment

    Application materials:Mine wastewater

    Category:Mining

    Adaptive equipment: Plate and frame filter press

    Hotline: +86-0371-63687155

    -Scan and add friends-

    -Exclusive service for you-

    Hotline:0371-86151888

    Scheme Introduction

    礦山

    Mine waste water mainly comes from pit water discharged from mining production, rain waste water from waste stone yard and ore washing and tailings waste water discharged from ore dressing plant. After the analysis of the Experimental Mine waste water by beibang laboratory, a certain amount of special acid waste water is included, it also includes heavy metals such as mercury, cadmium, lead, chromium and other elements with significant toxicity such as nonmetal sulfur, arsenic and other elements with certain toxicity such as zinc, copper, nickel and so on, tailings leachate will cause the pollution of groundwater and soil. The scheme we have proposed is: flow into the three-layer sedimentation tank through the drainage ditch, and the clean water generated by the water deposited through the three-layer sedimentation tank after a long time can be recycled. Use a mixer in the three-layer sedimentation tank, stir evenly, and use a slurry pump to drive the slurry from the three-layer sedimentation tank into the slurry tank. Use the medicament conditioning tank to add medicine (add the medicament into the mud tank through the medicament tank). After the mud tank is evenly stirred by the mixer, it is provided by the plunger Mud Pump (the plunger mud pump needs to be specially customized, using the spherical valve core) dripping into the filter press for dehydration treatment, the mud cake formed by the treatment is pulled away and buried, and the clean water flows into the clear water tank for recycling, finally achieving the purpose of turning the sewage into clean water.

    Recommended cases

    View more

    Related products

    View more
    Sheet Filter

    Filtration Area:10-30㎡

    Number of Filter Plates:16-49pieces

    800 Chamber Filter Press with Automatic Plate Shifter

    Filtration Area:30-80㎡

    Number of Filter Plates:23-62pieces

    800 Mechanical Plate-and-Frame Filter Press

    Filtration Area:30-80㎡

    Number of Filter Plates:23-62pieces

    Number of Filter Frame:24-63pieces

    630 Mechanical Plate-and-Frame Filter Press

    Filtration Area:15-40㎡

    Number of Filter Plates:18-49pieces

    Number of Filter Frame:19-50pieces

    E-mail: info@bbnep.com
    Sales Hotline:+86-0371-63687155
    Address of Marketing Center:Floor 10, Building B, Xicheng Science Technology Building, Hi-tech Zone, Zhengzhou.
    Headquarters:Yuzhou City, Henan Province (turn right for 500 meters from the southern exit of Zhengzhou-Luanchuan Express Way)
    All rights are reserved by Henan BEBON Intelligent Environmental Protection Engineering Technology CO., Ltd 工信部備案號: 豫ICP備19039114號-2
    Online
    Email
    Top
    日日久久大香线蕉综合

    1. <button id="si2xm"></button>

      <progress id="si2xm"></progress>

      <progress id="si2xm"></progress>
      <progress id="si2xm"><big id="si2xm"><video id="si2xm"></video></big></progress>
    2. <nav id="si2xm"><center id="si2xm"></center></nav>
    3. <rp id="si2xm"></rp>